歡迎光臨興建機械有限公司水輪機廠(本廠提供:水輪機[混流式.貫流式.軸流式.沖擊式.斜擊式] 、水電站設備)
New Message Message List Message Management

Name: 李義春
Tel: Email:
Theme:
Design head(m): 15Maximum head(m) : 15Minimum head(m): 12
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 未定Adress:
Your Message:
Message Time:2007-06-11 11:07:19
Answer:

Name: 陰志強
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我準備購買一套50KW的水力發電機,水庫水位12米,出口水管315.請問;
1  我們最大能配套多大的發電機.
2  50KW的全套要多少錢
3  
Message Time:2007-06-09 17:51:41
Answer:

Name: 楊吉武
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我想咨詢一下:假如水頭枯水流量直徑在一米.落差在二十米.理論上能帶動多大的發電機組?
Message Time:2007-06-06 21:53:52
Answer:

Name: 張軍平
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
你好:
我是新疆永祥公司的現在,用戶需要每小時100KW的小型發電機組,他們是在河流上自建發電站,大概幾家一個,準備在沿河上修一些小型發電站.請幫忙幫著設計一下他們的發電站謝謝!張軍平
Message Time:2007-06-04 17:33:37
Answer:

Name: 楊先生
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我的已建小水電站盡水頭70米,裝機400kw,水機型號為hl110-wj-50的,請幫忙發個運行曲線圖來。謝謝!
Message Time:2007-06-04 17:31:36
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:45/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200

北京时时彩开奖号 彩票走势图怎么看能懂 陕西快乐10分开奖视频 搜搜配资 南粤风采26选5开奖信息 天津时时彩官网开奖网址 青海十一选五走势图和策略 福彩20选5窍门 陕西快乐10分前三走势图 圣莱达股票 江西十一选五开奖数据